Installation of Building at Site

  1. Site Preparation:

    • Clear the construction site of any debris or obstacles.
    • Level the ground and prepare a stable foundation.
  2. Anchor Bolts Installation:

    • Install anchor bolts into the foundation as per the building design specifications.
  3. Column Installation:

    • Position and secure the main columns onto the anchor bolts.
    • Ensure proper alignment and spacing based on the engineering drawings.
  4. Rafter Installation:

    • Connect the rafters to the columns, forming the main frame of the building.
    • Ensure accurate placement and alignment.
  5. Purlin Installation:

    • Install secondary framing members, such as purlins, to support the roof panels.
    • Ensure proper spacing and alignment.
  6. Roof and Wall Sheeting:

    • Attach the roof and wall panels to the framing using appropriate fasteners.
    • Ensure a tight fit and proper sealing to prevent water leakage.
  7. Girt and Eave Strut Installation:

    • Install girts and eave struts to provide additional support for the walls and roof.
  8. Bracing:

    • Install diagonal and cross-bracing to add stability and strength to the structure.
    • Follow the design specifications to ensure proper bracing.
  9. Insulation and Ventilation:

    • Install insulation materials if required.
    • Ensure proper ventilation systems are in place.
  10. Trim and Accessories:

    • Install trim and other accessories as per the design specifications.
    • This may include doors, windows, gutters, and other finishing elements.
  11. Quality Checks:

    • Conduct thorough quality checks at each stage of the erection process.
    • Ensure that all components are securely fastened and aligned correctly.
  12. Safety Measures:

    • Adhere to safety guidelines and regulations throughout the erection process.
    • Provide necessary safety equipment and training for workers